Starting an apartment renovation often brings stress and uncertainty, but a carefully planned sequence turns the process into a clear, predictable system. Knowing what to do first, how to prepare walls, and when to install utility systems helps minimize errors. Understanding the stages also helps control the budget and finish work on time. For advice on avoiding common problems, read Common Mistakes During Renovation. Mshenoveli offers a complete renovation service: we plan every step in advance and supervise it ourselves.
Preparation: measurements and cost estimate
The first step in renovation is thorough preparation. Work begins with detailed measurements and an assessment of the apartment’s actual condition. Professional surveying includes checking that walls are vertical, measuring differences in floor levels, and recording the positions of existing utility shafts. These findings form the basis of an initial cost estimate. It lists the known work, materials, expected costs, and issues that can only be clarified after further inspection. This document provides an initial view of the budget and makes it easier to agree on changes in writing.
At this stage, we also decide on the design project. A professional design project helps organize the space, plan different types of lighting, and position furniture accurately. Starting renovation without a project often leads to incorrectly routed utilities and extra costs. To reduce these risks, read our recommendations on planning a renovation. Before work begins, the initial costs are calculated from the site inspection and the agreed scope; later changes are recorded separately.
Choosing a frame condition: black, white, or green?
Before renovating an apartment, we need to establish its actual condition and the work still required. Black, white, and green frame are commercial labels indicating approximate levels of completion. Their precise specifications vary between developers and projects, so the label alone does not determine the scope of work.
- Black frame: usually indicates an earlier stage of completion, with more renovation work potentially remaining. The exact list is established by the contract appendix and an on-site inspection.
- White frame: often means a more prepared condition, but the actual state of surfaces, partitions, and utility networks must be checked individually.
- Green frame: often describes a more advanced completion package, but this term has no single mandatory standard either.
For a detailed comparison, see Black, White and Green Frame Apartments. Under Mshenoveli’s current terms, for apartments up to 60 square meters, the renovation period is up to 45 calendar days for white or green frame and up to 60 calendar days for black frame. These periods apply only to the scope of work agreed in advance. The specific schedule is determined by the property’s condition and the contract.
Demolition and construction of walls
In an existing apartment or an open-plan unit in a new building, demolition begins only when the project confirms that it is necessary. First, the structures and utility networks must be inspected, the relevant utilities disconnected where necessary, and any required approvals clarified. Old partitions, doors, finishes, or damaged layers are then removed within the project scope and in accordance with safety rules.
After demolition, we construct new walls and partitions according to the design project. We use materials such as aerated concrete blocks, brick, or plasterboard. Each has different sound insulation and strength characteristics that must be considered in the project beforehand. Wall geometry affects the later installation of tiles and built-in furniture. Permitted deviations are determined by the project, the material, and the requirements of the final finish, and are checked with appropriate measuring tools.
Rough-in work and utility installation
Once the walls are built, installation of the utility systems begins. This includes electrical, plumbing, and heating systems. These are concealed parts of the apartment that become difficult to alter after the finishes are complete. A qualified specialist must determine the electrical cable cross-section, protective devices, and installation method according to the load, wiring conditions, and applicable technical requirements. Plumbing pipes and fittings must also be selected according to the project, operating pressure, temperature, and manufacturer’s instructions.
At this stage, we carry out the following work:
- Laying electrical cables and installing boxes for sockets and switches;
- Installing water pipes and water connection points for the bathroom and kitchen;
- Installing the heating manifold system and pipes;
- Preparing the air-conditioning pipe routes.
Utilities must follow a plan agreed in advance. For example, the positions of kitchen appliances and the different types of lighting need to be decided beforehand so that sockets are installed at the correct height. After the utility work, we plaster the walls with a mix compatible with the selected system and install the floor-leveling layer. Surface tolerances are checked against the requirements of the final finish and the manufacturer’s installation instructions.
The finishing stage
After the rough work is complete and the surfaces have dried, we begin the finishing work that gives the apartment its final appearance. We start by preparing the ceilings and walls, applying filler, and sanding.
The main finishing steps are:
- Painting walls or hanging wallpaper;
- Laying ceramic tiles in wet areas and the kitchen;
- Laying laminate, parquet, or vinyl flooring;
- Installing ceilings, whether plasterboard or stretch ceilings, and the final light fixtures.
At this stage, particular attention is paid to corners, joints, and tile grout lines. The project and contract must describe the inspection stages, responsible people, permitted deviations, and acceptance criteria. Interim inspections help identify mistakes promptly, but workmanship must be confirmed by actual measurements and acceptance documents.
Furniture installation and handover
The final stage of renovation is installing the individually selected furniture and putting the apartment in order. Once the finishing work is complete, we clean the apartment thoroughly and bring in the custom-made furniture.
Custom furniture made from MDF, laminated board, and PVC takes an average of 20-22 working days to manufacture. Kitchens, wardrobes, and bedroom systems made in our own factory arrive at the property ready for assembly, which we complete within a few days. After the furniture is installed, we fit the sanitary fixtures and accessories, carry out a final deep clean, and hand the keys to the client.
Mshenoveli’s full renovation service covers the agreed work cycle from the first consultation through handover. The condition at handover, items the client must purchase, and work excluded from the service are specified in the individual contract and cost estimate.
Conclusion
Apartment renovation is a complex process involving several stages. Its success depends on good organization and a clear sequence of work. Every step, from measurements and the cost estimate through furniture installation, requires a professional approach and continuous quality control. Under Mshenoveli’s current terms, payments are divided into 40/40/20 installments; the precise timing, associated work, and acceptance criteria for each payment are specified in the individual contract. If a warranty is offered, the contract must state its duration, conditions, exclusions, and the work it covers. For a consultation, you can request a call or contact us at +995 577 19 01 09.
Frequently asked questions (FAQ)
How long does apartment renovation take? The period depends on the area, actual condition, and agreed scope of work. Under Mshenoveli’s current terms, for apartments up to 60 square meters, renovation takes up to 45 calendar days for white or green frame and up to 60 calendar days for black frame. The specific schedule is stated in the contract.
What are the payment terms? Under Mshenoveli’s current terms, payments are divided into 40/40/20 installments. The precise timing, associated work, and acceptance criteria for each payment are defined in the individual contract.
What is included in white frame? There is no single mandatory specification for white frame. Check the condition of walls, floors, partitions, and utility networks against the appendix to the purchase contract and during an on-site inspection. See the detailed list in our comparison of frame conditions.
Is the completed work covered by a warranty? The warranty applies only to work listed in the contract and carried out by the contractor. Its duration, conditions, and exclusions must be specified in the individual contract.
What materials are used for custom furniture? We use high-quality MDF, laminated board, and PVC. We manufacture furniture in our own factory within 20-22 working days.