How to avoid renovation mistakes
Renovation feels like a fresh start: a modern space, pristine walls, and the smell of a clean home. But a few unplanned steps can turn that fresh start into a real headache.
Here are common mistakes found in many apartments. Often, we realize too late that proper planning at the outset could have prevented them.
Missing bathroom waterproofing: damp and mold
The bathroom is one of the most important areas, yet it is often treated superficially. A lack of waterproofing:
- Allows moisture into the walls of adjoining rooms;
- Causes mold, unpleasant odors, and black stains;
- Eventually damages the completed renovation as well.
Without a double waterproofing layer in the bathroom, moisture will find a way through. It is then only a matter of time before it starts damaging other rooms.
What to do: Waterproof the floor and walls, including corners in wet areas. A double cross-coat application is preferable: apply the first coat horizontally and the second vertically. Spending on better-quality material will pay off in the savings it brings.
Call usElectrical work that does not meet European standards: a hidden danger
Electrical mistakes are among the least visible until something trips, burns out, or, worse, causes a fire.
Wiring that does not meet European standards means:
- Insufficient cable cross-section;
- Unsuitable circuit breakers;
- No dedicated circuits for appliances with high electricity consumption.
With dozens of devices operating in today’s apartments, an old-style electrical network simply cannot handle the load.
What to do: Ask for a design, precise calculations, quality copper cables, and dedicated circuits for the main zones. Safety comes first.
Request a callParallel heating pipework: tangled pipes and an inefficient system
Parallel routing of heating pipes often creates visual and technical disorder.
A parallel system:
- Increases the number of pipes;
- Makes future maintenance more difficult;
- Often distributes heat unevenly;
- Causes unnecessary expense and heat loss.
A manifold system is a convenient, sensible alternative in which everything is organized, centralized, and easy to manage. Remember that every joint presents a risk of leakage.
What to do: Plan the heating according to a design rather than improvising. An incorrectly planned layout will cause condensation in the home, creating conditions for mold and damp.
Call usMismatched floor levels: laminate and ceramic tile
One of the most common mistakes is failing to account for floor levels. The result?
- Tripping over steps or differences in level;
- Visual defects;
- Dust accumulation;
- Noise when walking;
- Difficulty moving furniture.
The problem becomes fully apparent only after renovation is finished, when all the flooring has been laid and correcting it is difficult.
What to do: Account for the thickness of porcelain tile and laminate in advance. Floor levels should be coordinated at the initial design stage so that transitions are smooth and safe.
Request a callConclusion: renovation starts with the details
Renovation also depends on details that often remain invisible. These determine the comfort and safety of the entire apartment, alongside your choice of colors and furniture.
Avoiding the mistakes listed above means:
- A dry bathroom and walls free from mold;
- Safe electrics;
- Efficient heating;
- Comfortable floors with a consistent appearance.
Your home can then become a space you truly enjoy living in.
Request a callQuestions and answers
What is the price per square meter?
The renovation price per square meter depends on the apartment’s frame condition:
Black frame: full renovation work from scratch.
White frame: a more limited scope of work.
Green frame: minor updates and adjustments.
Updating an existing renovation: giving the interior a new lease of life.
Mshenoveli offers payment in three stages: 40/40/20%, providing transparency and security for the project:
The first 40% is paid at the initial stage, before work begins.
The second 40% is paid after the first stage is complete, as the second stage begins.
The final 20% is paid as soon as the third stage is complete and the project is fully ready.
Please note: after each payment, the client receives Form №2 as a document confirming payment.
Do you work outside the main cities?
Mshenoveli provides high-quality services in Tbilisi and Batumi, as well as the surrounding areas within a 50 km radius.
- Please note that the service does not cover high-mountain municipalities.
When will you hand over the apartment?
We offer fast, reliable renovation services for different frame conditions:
White or green frame (≤60 m²): 45 calendar days.
Black frame (≤60 m²): 60 calendar days.
Updating an existing renovation: the period is determined by the property’s current condition.
Mshenoveli has successfully completed 100+ projects over the past 4 years.
Our team consists of qualified specialists with at least 10 years of experience, ensuring high quality and professional workmanship.